Smarter Processes Inc - Soda Springs, Idaho
Project Date: 2008
Details: Yanke Energy put together a 40’ Elevated MCC Building. Our shop fabricated the stands; (2) access stairways as well as providing pull boxes below each MCC section. Our electrical group installed the new MCC sections, Switchboard and PLC Cabinet. The building is fully insulated with wafer board interior walls with an AC/Heater unit. Once in the field, the contractors only had to land all of the field runs.