![Yanke Energy](../images/header/4.jpg)
Coastal Carolina Clean Power, LLC - Kenansville, North Carolina
Project Date: 2008
Details: Yanke Energy designed and fabricated (2) Metering Bin with 6-20” diameter screws. Each screw is individually driven with a VFD. Each unit has a hopper with a maximum capacity of 40.5 cubic yards of storage. On the top of each hopper we also supplied a “Wig-Wag” distributor to ensure the hopper would fill across the width of the screws.
![Coastal Carolina](../images/projects/coastal/coastal1.jpg)
![Coastal Carolina](../images/projects/coastal/coastal2.jpg)